
In August of 2012 installation and construction was completed of a single 750kW wind turbine, a photovoltaic solar array, reference array and tracker (33.1 kW total) along with a solar thermal array at its Chagrin Falls, Ohio campus.

Ground Breaking
|

Base Construction
|

Turbine Construction
|
|